
This category covers the equipment that makes heat and removes it on an industrial scale: boilers and heaters for process steam and hot water, and refrigeration plant for cold stores, food factories and climate control. Buyers include food and beverage processors, textile mills, hospitals, hotels, logistics operators, building contractors and the installers who design and commission these systems.
Selection starts with the load: steam output in kg/h, heat duty in kW, or cooling capacity at a stated room temperature. Fuel availability, refrigerant rules in the destination country and electrical supply (voltage and frequency) narrow the field further. Pressure equipment usually needs certification such as the EU Pressure Equipment Directive or ASME stamping. The trade is served by boiler and HVAC manufacturers, refrigeration component makers, panel factories and engineering contractors who supply complete turnkey systems.
When comparing suppliers in this category, ask for rated capacity under stated conditions, efficiency or coefficient of performance data, the pressure vessel code applied and the refrigerant used. Check that the electrical supply and control panel suit your site, what commissioning support and spare parts are offered, and which certificates are needed for import in your market.




















Boiler makers, refrigeration manufacturers, panel factories and HVAC distributors list equipment on Towobo with capacities, fuel or refrigerant type, power supply, certifications and lead times. Buyers compare these listings and request quotes for single units or complete plant rooms.
Manufacture boilers, burners, chillers or cold rooms? Open a store on Towobo, present your range with full ratings, and connect with processors, contractors and facility managers sourcing heating and cooling equipment.
Key information for B2B buyers sourcing boilers, heating & cooling equipment from global manufacturers.
Factory-direct orders typically start at 100–500 units. Wholesalers often accept 10–50 unit MOQs. Always confirm MOQ and price breaks in writing before placing a bulk order.
Request certificates relevant to your market: CE (EU), ISO 9001 (quality), RoHS (electronics), and UN38.3 (battery transport). Verify originals before payment.
Sample orders typically ship in 3–7 days. Production runs take 15–45 days depending on volume. Confirm Incoterms (FOB, CIF, EXW) and freight charges before signing.
Request physical samples before committing to bulk. Use Towobo's Payment Protection on all transactions. Compare at least 3 suppliers on price, lead time, and certifications.