This category covers every device that changes voltage, frequency or current form between the grid and the load. It runs from oil-filled units weighing tens of metric tons down to rack-mounted UPS and DIN-rail drives, and it serves utilities, contractors, data centers, factories and solar installers.
Start with the job: changing voltage needs a transformer; keeping a load alive through outages needs a UPS; controlling a pump or fan needs a drive. Then size by kVA or kW, input and output voltages, phases and duty. Efficiency, cooling method, harmonic behavior and enclosure rating separate one offer from another, and most products are built to an IEC family such as IEC 60076 for transformers or IEC 61800 for drives.
Transformer works build to order with long lead times, while power electronics makers hold stock in standard ratings. Distributors, system integrators and solar wholesalers resell both, often adding installation and commissioning.
When comparing suppliers across this category, ask for type-test or certification reports on the specific rating, not a family brochure. Check load and no-load losses or efficiency at the operating point, the warranty terms and what they exclude, spare parts availability, and whether the supplier offers commissioning or remote support. Confirm lead time from order to dispatch, especially for custom transformers.






















Transformer manufacturers, power electronics factories, distributors and integrators list their ratings, voltages, standards, cooling methods and lead times. Buyers can filter by product type, compare offers for a given kVA or kW rating and request quotes from several sellers at once, attaching load details or a single-line diagram where it helps the seller size the equipment.
Build transformers, UPS systems, drives or converters? Open a store on Towobo, publish your rating tables and datasheets, and reach contractors, utilities and plant buyers sourcing power equipment.
Key information for B2B buyers sourcing transformers & power conversion from global manufacturers.
Factory-direct orders typically start at 100–500 units. Wholesalers often accept 10–50 unit MOQs. Always confirm MOQ and price breaks in writing before placing a bulk order.
Request certificates relevant to your market: CE (EU), ISO 9001 (quality), RoHS (electronics), and UN38.3 (battery transport). Verify originals before payment.
Sample orders typically ship in 3–7 days. Production runs take 15–45 days depending on volume. Confirm Incoterms (FOB, CIF, EXW) and freight charges before signing.
Request physical samples before committing to bulk. Use Towobo's Payment Protection on all transactions. Compare at least 3 suppliers on price, lead time, and certifications.